Berkeley Homes

Harvest Ride

Number of Units

788 Units

Meters of road

903m

Site Area

65 Acres

O’Halloran & O’Brien successfully delivered the groundworks and infrastructure package for the landmark Woodhurst Park development in Warfield, Berkshire. Set within a 65-acre country park environment, the scheme comprises 788 new homes, including 115 designated affordable units.

Our scope of work covered full infrastructure delivery, including estate roads, extensive drainage networks, substructure works, S278 connections and the construction of a reinforced concrete bridge linking key areas of the site. Sustainable drainage systems were implemented throughout, featuring soakaway ponds and landscaped attenuation areas to complement the natural setting and enhance flood resilience.

Scope of Works:

  • Roads, Drainage & Services – full installation of infrastructure and service connections across the development
  • Bridge Works – construction of reinforced concrete bridge and associated approaches
  • Substructure Works – traditional and piled foundations to all plots
  • 278 Works – highway tie-ins and connection to the existing road network
  • SUDs & Soakaway Ponds – sustainable drainage systems integrated within landscaped areas
  • Site Infrastructure – utilities, access routes and supporting structures across the 65-acre site