Taylor Wimpey

Knights Reach

Number of Units

763 units

Meters of road

2481m

Site Area

190,205 m2

O’Halloran & O’Brien are delivering the full groundworks and infrastructure package for Taylor Wimpey’s flagship Knights Reach development in Dartford. The works included the construction of 11 apartment blocks alongside 2-, 3-, and 4-bedroom homes, with extensive roads, sewers and S278 connections. The site featured significant environmental and logistical challenges, including the removal of a 26,000m³ knotweed-contaminated soil heap — completed in just five weeks, averaging 110 muckaway loads per day while maintaining progress on other areas of the project.

Scope of Works:

  • Roads, Drainage & Services – installation of road network, foul and storm sewers, service connections, and S278 works
  • Substructure Works – raft foundations to plots, piled foundations to flats, ground beams and slabs
  • Domestic Drainage – installation of private plot drainage and connections to mains
  • External Works – paving, kerbing, SUDS features including boreholes, permeable tanks, ponds and crate systems

80+

LIVE CONTRACTS

40+

CLIENTS

50+

YEARS IN BUSINESS